Then, build.
Build.
Our crew. Our racks. A commissioning process that doesn't skip steps.

What's included
Scope of the phase.
14 deliverables
- Custom racks, enclosures, and mounts
- Pre-fab assembly and burn-in
- Millwork and scenic coordination
- Low-voltage trades, structured cabling, fiber
- LED, projection, and display installation
- Loudspeaker rigging and acoustic treatment
- Lighting fixture install and addressing
- Network configuration and time-sync
- System testing and calibration
- Color, audio, and show-control tuning
- Punch-list closure
- As-built documentation and credentials
- Operator training and adoption support
- Warranty and support transition
How we work
Principles that show up in the drawings.
Our own crew
Not a 1099 roster assembled per project. The people who rack your gear are the people who service it.
Pre-fab, then ship
Racks built, tested, and burned-in at our shop before they hit the site. Field time is for the things that can only happen on site.
Commission, don't paper over
Measure, calibrate, sign off. We close the punch list. We don't redefine it.
When to bring us in
After bid award, or as your design-build partner from the start. We travel for installations nationally and keep the project lead on site through commissioning.